Events2Join

Upcoming Events in Guptipara | Page 5


  • Set of Modification Bracket

    Set of Modification Bracket

    13 May | BICKY ROADIES

    Set of modification bracket for HOM fixed Contact Jaw & block head in roof line of Electric Locomo tives as per CLW specification No. CLW/ES/C-49 aLT. C (Ref.: RDSOS Modification Sheet no. .....

  • professional makeup class is staring

    professional makeup class is staring

    19 May | memari new bus stand

    Today. Class Demonstration. day 1 . Admission is going on. .The next batch starts on May 19th... Hurry up...

  • Amc for Railway Track Maintenance

    Amc for Railway Track Maintenance

    13 May | Hooghly

    Annual Maintenance Contract for Maintenance of Railway Track of DCC (LPDC) from Take Off Point at Janai Road Station (JOX) to Buffer Point Inside DCC Near Central Laboratory Building with Bush and.....

  • SSWC: International Conference on Smart Systems and Wireless Communication

    SSWC: International Conference on Smart Systems and Wireless Communication

    29 Nov | JIS College of Engineering 41 days left

    The easychair platform encompasses a diverse range of technology and interdisciplinary fields such as Smart Systems, Wireless Communication, and Machine Learning Applications. It offers a wide.....

  • Set of Lp.Hp Connecting Rod

    Set of Lp.Hp Connecting Rod

    11 May | HP World

    SET OF LP.HP CONNECTING ROD FOR COMPRESSOR TYPE VV 120 OF KNORR BREMSE MAKE PART NO. 8.120.0.150.003.7 - 2 NOS.PER SET AND PART NO.8.120.0.150.004.7-1 NO. PER SET. [ W arranty Period: 30 Months.....

  • Andrew Yule And Company Limited

    Andrew Yule And Company Limited

    11 May | Andrew Yule Engineering Factory

    Andrew Yule And Company Limited | Tools Boring Tip (p-30) 1/2" Sq. , Required For Machine Shop. Make-miranda/jk/indoloy. Carbide Tip | Closing Date : 24-05-2024 |..

  • Animal Resources Development Department

    Animal Resources Development Department

    11 May | Animal resources development department

    ARD Development Of Environment Controlled Egg Room At Haringhata Poultry Layer Farm, Haringhata, Nadia-741235 Under West Bengal Livestock Development Corporation Limited, Lb-2, Sector-iii, Salt.....

  • Procurement of Full Gloss Polyurethane Enamel (Two Pack) for the Exterior Finishing Paint Etc.

    Procurement of Full Gloss Polyurethane Enamel (Two Pack) for the Exterior Finishing Paint Etc.

    11 May | Dulux

    Full Gloss Polyurethane Enamel (Two Pack) for the Exterior Finishing Paint of Railway coaches co nforming to RDSO Spec.no.M&C/PCN/100/2018 Chapter-V, M&C/PCN/100/2018 with Amendment 1B(REV 2.0.....

  • ANDREW YULE AND COMPANY LIMITED

    ANDREW YULE AND COMPANY LIMITED

    7 May | Andrew Yule Engineering Factory

    Andrew Yule And Company Limited nail, m. s 3 lg., required for painting , blasring & packing dept., grit blasting brush, 12 inch long brush Deadline : 20 May 2024 Updated : 30 Apr 2024 Value .....

  • Indian Institute of Science Education and Research

    Indian Institute of Science Education and Research

    11 May | Indian Institute of Science Education and Research Kolkata (IISER Kolkata)

    IISER Providing And Fixing Mosquito Net At Nscb And Icv Hostel | Indian Institute Of Science Education And Research Tenders West Bengal..

  • End Bracket Pe for Hhp Traction Motor

    End Bracket Pe for Hhp Traction Motor

    5 May | Eastern Railway Workshop, Kanchrapara

    End Bracket PE for HHP Traction motor type 4303BY (BHEL Make) as per BHEL Drawing No. : 0 4394328001. Make : BHEL or exactly similar in other Make. Note - Company name and P. O. No. should be em.....

  • Stock-Market-Simulator-in-KrishnaChandrapur

    Stock-Market-Simulator-in-KrishnaChandrapur

    4 May | Krishna Chandra pur

    Best Virtual Stock Trading Platform in KrishnaChandrapur. Top Stock Market Simulator in KrishnaChandrapur..

  • Supply and Commissioning of Meter

    Supply and Commissioning of Meter

    3 May | Kampa Electric Supply Office (WBSEDCL)

    Supply and commissioning of Meter Calibration unit as per technical specification enclosed in anne xure. [ Warranty Period: 30 Months after the date of delivery ] Contract Category.....

  • Corrigendum: Repair Maint of Cooling Appliances such as Acs, Water Cooler, Refrigerator, Deep Freezer Etc in Kankinara Area under Ge (North) Kolkata

    Corrigendum: Repair Maint of Cooling Appliances such as Acs, Water Cooler, Refrigerator, Deep Freezer Etc in Kankinara Area under Ge (North) Kolkata

    3 May | Kamalaya Home Appliance Services

    REPAIR MAINT OF COOLING APPLIANCES SUCH AS ACs, WATER COOLER, REFRIGERATOR, DEEP FREEZER ETC IN KANKINARA AREA UNDER GE (NORTH) KOLKATA Miscellaneous WorksTender ID : 2024_MES_648524_1 Tender.....

  • Pipe Clamp for Ss Pipe

    Pipe Clamp for Ss Pipe

    3 May | Rangajoba Hardware Store

    Pipe Clamp for Ss Pipe of Item no 5 as Per Drawing No. Icf Std 3-5-028 Contract Category: ExpenditureContract Type : Goods Tender Type : Open - Indigenous Contract Category : Expenditure.....

  • Earth Return Brush Holder Assembly

    Earth Return Brush Holder Assembly

    3 May | Eastern Railway Workshop, Kanchrapara

    EARTH RETURN BRUSH HOLDER ASSEMBLY COMPLETE WITHOUT CARBON BRUSH FO R WAG-9 & WAP-7 (3 PHASE) CLASS OF LOCOS. Spec/Drg No- CLW SPECN.NO. CLW/ES/3/0017 ALT- D ( SCOPE OF SUPPLY AS PER SHEET 9). and.....

  • Monthly Basis Cab & Taxi Hiring Services - Suv; 1500 Km X 360 Hours; Local, Qty: 1

    Monthly Basis Cab & Taxi Hiring Services - Suv; 1500 Km X 360 Hours; Local, Qty: 1

    29 Apr | Mayapur cab

    Monthly Basis Cab & Taxi Hiring Services - SUV; 1500 km x 360 hours; LocalQuantity Required: 1 Start Date: 23-04-2024 6:17 PM End Date: 08-05-2024 12:00 PM..

  • Monthly Basis Cab & Taxi Hiring Services - Suv; 1800 Km X 360 Hours; Local, Qty: 1

    Monthly Basis Cab & Taxi Hiring Services - Suv; 1800 Km X 360 Hours; Local, Qty: 1

    27 Apr | Mayapur cab

    Monthly Basis Cab & Taxi Hiring Services - SUV; 1800 km x 360 hours; LocalQuantity Required: 1 Start Date: 17-04-2024 6:23 PM End Date: 29-04-2024 12:00 PM..

  • Transformer Oil Pump

    Transformer Oil Pump

    27 Apr | Kanchrapara

    Transformer oil pump specification size 80 x 80, power 4 HP/3 KW, Volt- 415 +/-10%, discharge-80 0 LPM, Head-11.4 meter, RPM-2850, Amp 6.5, Insulation class H, IP-67, Similar to Flowwell model no.....

  • Procurement of Two Pack [Full Gloss Polyurethane Enamel (Two Pack) Exteriorvfinishing Paint Etc.

    Procurement of Two Pack [Full Gloss Polyurethane Enamel (Two Pack) Exteriorvfinishing Paint Etc.

    26 Apr | Dulux

    FULL GLOSS POLYURETHANE ENAMEL (TWO PACK) EXTERIORVFINISHING PAINT TO SP ECN.RDSO/M&C/PCN/100/2018 CHAPTER-V COLOUR.SARSON YELLOW RAL 1021 (METTALLIC FINISH) (Shelf Life 12 Months) [ Warranty.....

All Events in Guptipara Today (Upcoming Events)