Events2Join

Ehc with Follow up Piston Assembled and Tested Condition for 210 Mw Unit of Ntpc- Unchahar, Hydrauli, Qty: 2

Khaga | Updated: June 15, 2024 02:41 AM
Ehc with Follow up Piston Assembled and Tested Condition for 210 Mw Unit of Ntpc- Unchahar, Hydrauli, Qty: 2

Location: Power industry

Address: NTPC, Unchahar, Niranjanpur, Uttar Pradesh

Date: 14 Jun

EHC WITH FOLLOW UP PISTON ASSEMBLED AND TESTED CONDITION for 210 MW unit of NTPC- Unchahar (Q3), HYDRAULIC AMPLIFIER COMPLETE ASSEMBLY for 210 MW unit of NTPC- Unchahar (Q3)Quantity Required: 2... More Detail

About Location:
Power industry

Power industry
Power station
Direction


Join Now

Frequently asked questions


Where is Ehc with Follow up Piston Assembled and Tested Condition for 210 Mw Unit of Ntpc- Unchahar, Hydrauli, Qty: 2 in Khaga?

Power industry, NTPC, Unchahar, Niranjanpur, Uttar Pradesh

When is Ehc with Follow up Piston Assembled and Tested Condition for 210 Mw Unit of Ntpc- Unchahar, Hydrauli, Qty: 2 in Khaga?

Ehc with Follow up Piston Assembled and Tested Condition for 210 Mw Unit of Ntpc- Unchahar, Hydrauli, Qty: 2 is scheduled for 14 Jun.

All Nearby Events Today (Upcoming Events)


More Events in Khaga