Events2Join

40 CFR § 403.12


430.56 Pretreatment standards for existing sources (PSES).

40 CFR § 430.56 - Pretreatment standards for existing sources (PSES). ... 403.12(b), (d), or (e), that it uses a TCF ... 40 CFR 403.12(b) that it uses ...

Baseline Monitoring Report - Richmond, CA

... 40 CFR 403.12(c)(1) through 403.12(c)(3). VII CERTIFICATION STATEMENT (403.12(a)(2)(ii)). I certify under penalty of law that this document and all ...

Categorical Industrial Users: Categories and Requirements

40 CFR PART. Aluminum Forming, 467. Battery Manufacturing, 461. Carbon Black ... The following types of reports are required under 40 CFR 403.12.

Significant Industrial User | Baton Rouge, LA - BRLA.gov

The industrial user annually submits the certification statement required in 40 CFR 403.12(q), LAC 33:IX.6123.Q and Ordinance Section 2.276, together with ...

15.52.070 Reporting requirements | Petaluma Municipal Code

A. In accordance with 40 CFR 403.12(e), periodic reports on continued compliance: 1. Any industrial user subject to a categorical pretreatment standard ...

IPP Glossary - State of Michigan

... 40 CFR Part 403 and that has been approved by a regional administrator or state director. Baseline Monitoring Report (BMR) [paraphrased from 40 CFR 403.12(b)].

PRETREATMENT PROGRAM SUBMISSION PACKAGE OUTLINE

... 40 CFR 403.12, or indicated by analysis, inspection, and surveillance activities as described in 40 CFR 403.8(f)(2)(v); and. • Enforcement Procedures [40 CFR ...

INDUSTRIAL PRETREATMENT PROGRAM PERMIT ... - Oregon.gov

The compliance schedule requiring program development shall be developed in accordance with the provisions of 40 CFR 403.12(k), and shall not exceed twelve (12) ...

Instructions for Completing the Baseline Monitoring Report (BMR)

requested in items 403.12(b)(4) and (5). Section 1 General Information – Identifying Information - 40 CFR 403.12(b)(1). • The legal name of the company or ...

Standard Conditions - City of San Diego

40 CFR Part 261 Waste Reporting Requirement (40 CFR 403.12 (p)(1)). The industrial user shall notify the IWCP, the EPA Regional Waste Management Division.

Generic Baseline Monitoring Report (BMR) Form for ... - Ohio.gov

Wastewater flow measurement. (See 40 C.F.R. 403.12(b)(4)). Regulated Process (type), Daily Average (gal/day), Daily Maximum ( ...

ENVIRONMENTAL PROTECTION AGENCY 6560-50-P 40 CFR ...

... 40 CFR part 3 (including, in all cases, subpart D to part 3), 40 CFR 122.22, and 40 CFR 403.12(l). Page 158. Page 158 of 255. (c) Initial ...

The Pretreatment Times - Philadelphia Water Department

40 CFR 403.12(p) requires a one-time report for each substance discharged to a POTW that, if otherwise disposed of, would be considered RCRA ...

QUALITY BASELINE MONITORING REPORT NORTH DAKOTA ...

... 40 CFR 403.12(c)(1) through 403.12(c)(3). RETURN COMPLETED. APPLICATION TO: North Dakota Dept. of Env. Quality. Division of Water Quality. 4201 Normandy Street.

Required Reporting: SIU to POTW and POTW to State/EPA - R8PA

If construction is not completed by the date, these report shall explain the delay. 40 CFR 403.12(c). 40 CFR 403.12(b). Page 10. 90 Day Compliance Report.

127.12 Signature and certification standards for electronic reporting.

The signatory and certification requirements identified in 40 CFR part 3 (including, in all cases, subpart D to part 3), § 122.22, and 40 CFR 403.12(l) must ...

FAQs • Who should be in this program? - Bangor, Maine

... 403.12(a) on the basis that the industrial user ... The list of industries that are subject to national pretreatment standards can be found in 40 CFR 403.6 and 40 ...

40 CFR Ch. I (7–1–14 Edition) § 442.21

ficer as defined in 40 CFR 403.12(l);. (3) The discharger shall submit a copy of its Pollutant Management Plan as described in paragraph (b)(1) of this.

Section 310

BOARD NOTE: Derived from 40 CFR 403.12(j) (2005), as amended at 70 Fed. Reg. 60134 (Oct. 14, 2005). (Source: Amended at 30 Ill. Reg. 17847, effective ...

Metal Finishing Wastewater Pretreatment Standards

40 CFR 403.12, 40 CFR 433 | Last Updated April 2024. Industrial users that discharge wastewater to a publicly owned treatment works (POTW) are subject to ...