NPDES Construction Stormwater General Permit
2022 Construction General Permit (CGP) | US EPA
The 2022 CGP provides permit coverage to eligible construction stormwater discharges in the following areas where EPA is the NPDES permitting authority.
Stormwater Permits | Missouri Department of Natural Resources
... NPDES stormwater discharge permit to allow additional time to comply with requirements. EPA delegated authority for the NPDES permitting program to the ...
Construction Land Disturbance Permits
The Missouri Area-Wide Land Disturbance Stormwater General Operating Permit MO-R100xxx is only applicable to a city, county, state or federal agency, or other ...
Stormwater Discharges from Construction Activities | US EPA
EPA Finalizes the 2022 Construction General Permit (CGP). Importance ... All NPDES permits for construction stormwater must address the ...
NPDES Permit For Construction Activities
Permit Renewal Notification: The General NPDES Permit for Construction Site Activities has been renewed as of September 22, 2023.
Construction Stormwater General Permit
We require regulated construction sites to get coverage under the Construction Stormwater General Permit. Following the requirements in this permit helps ...
General Permits - Illinois Environmental Protection Agency
The renewal of the General NPDES Permit for Stormwater Discharges from Construction Site Activities (Permit No. ILR10) was finalized on September 13, 2023. This ...
Construction Stormwater General Permit - NPDES - ORIA - WA.gov
This permit ensures that construction site operators follow measures as to prevent stormwater from washing soil, nutrients, chemicals and ...
IDEM: Storm Water Permitting: Construction / Land Disturbance ...
The CSGP is a performance-based regulation designed to reduce pollutants that are associated with construction and/or land-disturbing activities.
Construction and Operating Permits, Mo. Code Regs. tit. 10 § 20-6.200
... permit or seek coverage under a promulgated storm water general permit. ... permit do not require an NPDES operating permit from the department. (B) ...
NPDES Construction Stormwater General Permits
The 2018 NPDES General Permits Nos. GAR100001, GAR100002 and GAR100003 authorizing stormwater discharges associated with construction activities to the ...
NPDES Stormwater Construction Permit - TN.gov
The new National Pollutant Discharge Elimination System (NPDES) General Permit for Discharges of Stormwater Associated with Construction Activities (CGP) has ...
General Stormwater NPDES Permits - ADEQ
Construction Stormwater Permits. Permit: ARR150000 Large Site (5 Acres or More). Expires: October 31, 2026. Annual Fee: $200 ...
NPDES Construction Stormwater General Permit - Clarksville, TN
This construction general permit (CGP) covers all areas of the State of Tennessee. 1.2. Discharges Covered by this Permit. 1.2.1. Stormwater discharges ...
NPDES 2022 Construction Stormwater General Permit
The California Water Boards hosted the 2022 Construction Stormwater General Permit Road Show, a series of informational workshops held across the state.
National Pollutant Discharge Elimination System (NPDES) 2022 ...
It requires NPDES permits for discharges from construction sites disturbing at least one acre but less than five acres, including sites that are ...
Construction Stormwater State Resource Locator - Missouri
an individual stormwater permit, or; coverage under Missouri's general permit. Disturbance includes, but is not limited to soil disturbance, clearing, grading, ...
2021 Construction General NPDES Permit - TN EPSC
100-4, including special requirements as provided in Subpart 6.4 of this general permit, operators of point source discharges of stormwater associated with ...
NPDES Construction Stormwater Program | KDHE, KS
Construction General Permits. Applicants seeking coverage under the KDHE NPDES Construction Stormwater General Permit are required to develop a site-specific ...
NPDES Construction Program - NC DEQ
... construction stormwater permit). The NPDES Construction Stormwater Program ... Construction General Permit (2019). Please review this web site first ...