refs/heads/b4/slab|memcg
refs/heads/b4/slab-memcg - Git repositories on kernel
... refs/heads/b4/slab-memcg. commit, 9bc6d6ce9d27faad8d4eec123f4aa09564215cad, [log] [tgz]. author, Vlastimil Babka
Docker memory limit causes SLUB unable to allocate with large ...
For our use case, it would be fantastic to have the option to discount the page cache (mmap'd disk space) and associated slab objects entirely ...
memcontrol: slab: fix obtain a reference to a freeing memcg
... memcg) // css_get can change the ref counter from 0 back to 1. ... memcg which is passed to the __memcg_kmem_uncharge() before calling __ ...
linux/mm/memcontrol.c at master · torvalds/linux - GitHub
... ref) { struct obj_cgroup *objcg = container_of(ref, struct obj_cgroup ... before the round-trip is complete. * * Reclaimers can specify a node in ...
refs/heads/master - external/github.com/steveyen/go-slab - Git at ...
... slab / refs/heads/master. commit ... before. Concurrency. The Arena returned from NewArena() is not ...
Looking at kmalloc() and the SLUB Memory Allocator - Matthew Ruffell
SLUB is also useful because it can merge slabs together, in order to keep memory overheads low. ... before. Hope you liked the read ...
[PATCH v3 00/19] The new cgroup slab memory controller
Slabs that had different sizes before will now have different sizes as well. ... head); redo: /* * Determine the currently cpus per cpu slab.
SLAB memory management - linux kernel - Stack Overflow
The slab allocator is an abstraction layer to make easier allocation of numerous objects of a same type. The interface offers the function
Swap keeps refcnt of swap entry in swap_map[]. [Before] swap_map[entry] = # of references + a ref from SwapCache. [After].
mm: memcg softlimit reclaim rework - LWN.net
... head); @@ -354,14 +352,6 @@ static inline void ... ref mem_cgroup_create(struct cgroup *cont) { @@ -4999,8 +4604,6 @@ mem_cgroup_create ...
360R-06 Design of Slabs-on-Ground - Engineering.com
static head, as for a basement slab below a water table, liquid ... Before slab installation, consider shrinkage testing of various ...
Underground Structures Standards (UGS)
... Slab Cover — Traffic — Normal Loading. VA 462 5'-6" x 10' x 9'-4 ... B4. B3. 5'-4". B5. B2. B4. B1. B3. B1. 2 Spaces. @ 8" O.C.. See Note 2. Sump.
proper elevation, the basin floor (slab) may be as far below the top of the ... sensors or fusible heads which cause the tower to be automatically ...
How long should I let this dry before working the slabs? - Reddit
I decided to take a section of log which is about 3-4 ft wide and 11 ft long to have slabbed by my cousin so i could make a table.
Concrete Vapor Retarders: Everything You Need to Know
If there is a vapor barrier under the concrete slab in my house, and the laminate installers put a vapor barrier on top of the slab, before installing the ...
ANSI/AISC 360-16 Specification for Structural Steel Buildings
... Slab . . . . . . . . . . . . . . 96. 1. Load Transfer for Positive Flexural ... B4. Member Properties ...
A geodynamic model of subduction evolution and slab detachment ...
... before slab detachment is complete, is 96 km. This indicates a depth ... references. References. related. Related. Data & Figures. Figure 1 ...
Engineering Design & Construction Standards - City of South Bend
pipe to a temperature below 100 degrees Fahrenheit before relieving the static head. ... Slab Reinf. #4 Bars. 6" O.C. (Two Mats). Extra Bars ...
Roadway Lighting Manual - Caltrans
slab of a box girder. They are used with the same lamps as soffit luminaires ... Table B4: Lighting Design Criteria for Isolated Intersection Lighting.
L6.1 DETAILS - Albemarle County
2 - #4 x 3'-0" SPACED AT 2"o/c, MIDDLE OF SLAB AT RE-ENTRANT CORNERS. WHERE NO SLAB JOINT OCCURS. ... B4. 1' - 8" 3' - 4"2' - 8" 6' - 0". 6' - 0". 6' - 0". 6 ...